- Aldermen’s Office
- Aurora Public Library
- City Clerk’s Office
- Civil Service
- Community Information
- Community Services
- Development Services
- Development Services Team (DST)
- Planning and Zoning
- Home Page
- Comprehensive Plan
- FAQ
- Neighborhood Planning Initiative
- Planned Development Districts
- Property Zoning Search
- Zoning Map Book
- Zoning Ordinance
- Historic Preservation
- Home Page
- Guidelines
- Aurora: An Architectural Portrait
- Grand Army of the Republic Memorial Hall
- The Lincoln Highway
- Sears Homes in Aurora
- Researching Your Home
- Buying and Selling Historic Aurora Properties
- Historic Preservation Awards
- Public Restoration Projects
- Historic Disclosure Information
- Historic Windows
- Economics
- Public Works
- Downer Place Bridges
- Engineering
- Staff
- Discharge Monitoring Reports
- Help Desk
- Forms
- Links
- City Benchmarks
- Overview
- Control Monument No.1
- Control Monument No.2
- Control Monument No.3
- Control Monument No.4
- Control Monument No.5
- Control Monument No.6
- Control Monument No.7
- Control Monument No.8
- Control Monument No.9
- Control Monument No.10
- Control Monument No.11
- Control Monument No.12
- Control Monument No.13
- Control Monument No.14
- Control Monument No.15
- Control Monument No.16
- Control Monument No.17
- Control Monument No.18
- Control Monument No.19
- Control Monument No.20
- Control Monument No.21
- Control Monument No.22
- Control Monument No.23
- Control Monument No.24
- Control Monument No.25
- Control Monument No.26
- Control Monument No.27
- Control Monument No.28
- Control Monument No.29
- Control Monument No.30
- Control Monument No.31
- Control Monument No.32
- Control Monument No.33
- Control Monument No.34
- Control Monument No.35
- Control Monument No.36
- Control Monument No.37
- Control Monument No.38
- Control Monument No.39
- Control Monument No.40
- Control Monument No.41
- Control Monument No.42
- New Development
- Standard Specifications for Improvement
- EGov P&Z Inquiries
- Water Production
- Rain Barrel Program
- Buildings and Permits
- Economic Development
- Customer Satisfaction Survey
- Airport
- Emergency Management
- Finance
- Fire Department
- Fire Prevention
- Home Page
- Commercial
- Notice to Business Owners
- Address Posting
- Duct Smoke Detector Requirements
- Evacuation and Fire Safety Plan
- Fire Alarms
- Fire Lanes
- Fire Watch Requirements
- Fireworks
- Hood Suppression Systems
- Planning
- Operational Permits
- Request for Fire Department Participation
- Smoke Control Systems
- Temporary Fuel Storage Tanks
- Community
- Staff
- Green Initiatives
- Human Resources
- Information Technology
- Law Department
- Mayor’s Office
- Operations
- Home Page
- Staff
- Animal Control
- Maintenance Services
- Parks and Recreation
- Property Standards
- Home Page
- Staff
- FAQ
- Forms and Brochures
- Online Ordinance Violation Payments
- Abandoned Vehicles
- Adjudication
- Be A Good Neighbor
- Carbon Monoxide Detectors
- Clean-Up Days
- Commercial Vehicles
- Enforcement Articles
- Garage and Yard Sales
- Graffiti Hotline
- Heating Requirements
- Inspector Bike Program
- Junk and Trash
- Occupancy Standards
- Parking Requirements
- Recreational Vehicle Parking
- Property Registration Help Desk
- Vehicle Repair
- Weed Abatement
- Sanitation
- Street Maintenance
- Water and Sewer Maintenance
- Police Department
- Home Page
- Staff
- Care Program
- Citizen Police Academy
- Crime Free Multi-Housing Program
- Crime Prevention
- Crime Stoppers
- Drive Now. Text Later.
- Employee of the Month
- Heroin Awareness
- Neighborhood Groups
- Noise Ordinance
- Office of Professional Standards
- Timmothy Pitzen
- Pipes and Drums
- Police Pension Fund
- Recruiting
- Red Light Enforcement
- Security Alarm Systems
- Southeast Kane County TRIAD
- FAQ's
- Contact Us
- Links
- Public Art Commission
- RiverEdge Park
- Special Events
Home || Fire Prevention || Commercial || Storage Tanks
Temporary Construction Site Fuel Storage Tank Requirements
General
2,500 Gallon maximum per site.
- Provide site plan of tank location.
- Obtain local permit which is good for 60 days (Renewable for 30 days). Failure to obtain permit will result in removal of tanks and a Fire Code Citation.
- Tank(s) must be protected from physical damage and ground must be substantially level.
- Tanks must be located at least 15 feet from any building and/or property lines (Including road).
- Area around tanks(s) must be free of combustibles for at least 15 feet in all directions.
- Proper labeling of tank(s). Tank owner name and phone number; product name contrasting to color of tank.
Propane
60 gallons (i.e. 3-100 lbs cyl.) water capacity total requires permit. 2,000 gallon maximum.
- All hose runs must be protected from physical damage.
- All portable heaters shall be located at least 20 feet from any portable tank.
- All portable heaters shall be of the type equipped with an approved automatic device to shut off gas flow and pilot in the event of flame extinguishment.
Fuel Tanks
Maximum two tanks per site.
- Precautions are to be taken to prevent spillage and/or overfills. Any contamination will be required to be cleaned up according to EPA regulations.
- Dispensing of flammables shall be by mechanical pump and a self-closing valve. Combustibles may be gravity dispensed if self-closing valve is used.

Get Your City News