- Home
- City Services
- City Services I - Z
- Public Works
- Major Projects
Major Projects
-
Aurora Transportation Center (ATC)
Improvements at the Aurora Transportation Center (ATC), that will improve safety and access, alleviate congestions, connects existing underutilized parking lots, connects surrounding neighborhoods and transit-oriented developments (TODs) and existing Regional Fox River Trail around the ATC transit station began Spring of 2018. The project limits extend along Broadway Ave. from Spring St. to the north ATC Entrance and will include the renovations of the current ATC parking lot, relocation of the existing Pace bus point, intersection improvements, and construction of pedestrian bridge. The project is supported by Federal funding. Local support are provided by the City of Aurora and Kane County Forest Preserve District, with in-kind supports from Fox Valley Park District, Pace, IDOT, Metra, and BNSF. The bridge is anticipated to be open in the Spring of 2021 after weather conditions allow for the final sealant to be placed.
-
Downer Place Bridges
Access images from the Downer Place bridges' construction.
-
Puentes De Downer Place
La Ciudad de Aurora planea demoler y reemplazar los puentes de Downer Place en el centro a partir de febrero.
-
Farnsworth Avenue Improvements
-
Farnsworth Ave at Marshall Blvd/Illinois Prairie Path
The City of Aurora is currently conducting a Preliminary Engineering Study for safety improvements at 1) the pedestrian crossing on the north leg Farnsworth Avenue at the Marshall Boulevard intersection, and 2) at the Illinois Prairie Path crossing of Farnsworth Avenue.
-
Indian Trl from Edgelawn Dr to Highland Ave
The City of Aurora is currently conducting a preliminary engineering study for roadway improvements on Indian Trail from Edgelawn Drive to Highland Avenue.
-
Sullivan Rd From Edgelawn Dr To Randall Rd
The City of Aurora is currently conducting a preliminary engineering study for roadway improvements on Sullivan Road from Edgelawn Drive to east of Randall Road.
-
Indian Trail Reconstruction Project
The City continues to work with the Illinois Department of Transportation to develop plans for the widening of Indian Trail between Mitchell Road and Church Road from 4 lanes to 5 lanes.
-
Montgomery Road Multi-Use Path Extension
The City is currently in the preliminary engineering phase for the extension of the Montgomery Road Multi-Use Path from Middlebury Dr to IL 59.
-
Lead Service Line Replacement Open Data Portal