Proposals shall be based on the requirements set forth in the Bidding Documents prepared by the Construction Manager and the Architect/Engineer. Only complete bid packages will be accepted. You must read work scopes located in Section 00 22 00-XX of the Project Manual.
The Bid Packages are:
BP2-03A – Concrete BP2-04 – Masonry
BP2-06A – Rough Carpentry
BP2-07 – Roofing and Sheet Metal BP2-08A – Overhead Doors
BP2-08B – Aluminum Framing and Glazing BP2-09E – Painting
BP2-11A – Lubrication and Vehicle Lift Systems BP2-11B – Touchless Wash System
BP2-14A – Elevator BP2-14B – Cranes
BP2-15A – Fire Protection BP2-15B – Plumbing
BP2-15C – HVAC
BP2-16 – Electrical and Low-Voltage
Related Documents:
Public Works BP2 -PROJECT MANUAL - Volume 1
Public Works BP2 - PROJECT MANUAL - Volume 2
Public Works BP2 -DRAWINGS
Addendum No 1 - Aurora Public Works Facility
Addendum No 2 - Aurora Public Works Facility BP2
Addendum No 3 - Aurora Public Works Facility BP2
Vendor Listing from Website 2.13.2023
As Read Bid Tabulation